PAGES

Saturday, December 2, 2017

December 2017

Lake Jean PA



Mast lowered, ready for tarp

Mast lowered on dutch tabernacle

 Head sail on Alado furler wrapped with scrap shrink wrap from dumpster

Outboard wrapped


Mainsail including sheets, boom and yard removed.
Outboard lifted from well.
Portable fuel tanks removed.
Cockpit bench seats removed.
Anchor rode removed.
Fenders removed.


Next lower mast and install tarp to tent cockpit.

Wednesday, November 15, 2017

November 2017


Boat on hard

Sunday, October 15, 2017

October 2017

Morris Arboretum, Philadelphia PA


Internal float switch on bilge pump failed, replacing with salvaged float switch from another pump.
Installed Monday October 16. Need to add mild steel blank to prevent the pump floating off the sump sole and tipping with float disengaging before last few inches are pumped. 

October 2017
Nautech Autohelm MK II tiller pilot
Compass drum mounting screw housing broken, drum mount twisted. Probably jammed in place due to drum tilt, resulting in spring stretched.
Rebuild including fabricating new drum mount.

Upon further examination of the interior of the autohelm casing there is evidence of the spring rubbing against the casing near the compass drum, depositing scrapings from the casing on the spring.
The question is now did the drum mount failure cause the spring to scrape against the casing or did the spring jamb against the casing and cause the drum mount to fail?

Longer wire cable and shorter spring?

New spring for cable tension
Epoxy for drum mount rebuils

Epoxy at drum mount, to be shaped after 24 hr set.

Sunday, September 10, 2017

September 2017

FDR Park
South Philadelphia
http://www.fdrpark.org/



Stone Harbor Bascule Bridge To Cape May Court House
http://stoneharbornj.org/
 Stone Harbor Jetty
 Stone Harbor US Life Saving Station
http://www.uscg.mil/history/stations/TATHAMS.pdf
http://uslife-savingservice.org/
 Stone Harbor Jetty
Stone Harbor Bascule Bridge to Wildwood



Jefferson University


Kennet Square Mushroom Festival
mushroomfestival.org

Thursday, August 10, 2017

August 2017

Sunrise Lake Erie

Moonset Lake Erie
Sunset Lake Erie

Saturday, July 8, 2017

July 2017

At the slip.
To do: adjust stays, bend on sail, install cockpit floor and bench inserts, adjust reverse gear on remote, more cleaning.

Waiting for start of ebb.

On travel lift ready to go.
Volendam


Sailing day camp Ijburg Netherlands

Bridge opening on the Amstel River Amsterdam Netherlands
Freight Barge on the Amstel river Amsterdam Netherlands


Windmills Netherlands
zaanschemolen.nl

Volendam Harbour Netherlands

Amstel River at the Hermitage


June 2017

Ullapool Loch Broom flood tide

Ullapool Loch Broom ebb tide
Charles Bridge Prague
Vitava River

Saturday, May 6, 2017

May 2017

Topping lift installed


Boom and Yard installed


Bottom paint
Mast, shrouds, boom, yard and headsail installed.
Photo to follow

Saturday, April 8, 2017

April 2017


Laurel Hill Cemetery North Philadelphia
https://thelaurelhillcemetery.org/



First one on B dock


6


3


1

Thursday, March 2, 2017

March 2017


Essington PA
Essington PA



Winslow Homer Fishing Boat Diamond Shoals North Carolina
Watercolor on paper

Winslow Homer, Fishing Boats Key West 1903.
Watercolor and graphite on paper.



PhilaU Campus in the snow

Fox Grove empty slips

Philadelphia City Hall tower from 1 South Broad