Mast raised, registration numbers installed. 

2021-04-24 
Outboard DC starter cable connected. I may relocate and use a boot.
Anchor and rode installed. More trash cleaned out. 

2021-04-30 Mast base sheet cleats installed. Travel lift hydraulic repair work and high winds may create schedule backup and delay splash.

I may remove stanchions  (except for bow and stern) and life lines, but add a tether or tether rings, this would be after splash or at next haul-out. I removed the tether rings in the cockpit when I did the bridge deck, but they will be reinstalled next week.
With delayed splash there are so many items I would like to do but will wait. A redesigned mast dutch tabernacle is on the list for this winter and a fore peak hatch for light and ventilation.