Several days after Ida we still have debris in the river. Tree and root ball returning up river with the tide.
Sunday, May 2, 2021
May 2021
2021-05-24 Bimini installed
2021-05-23 Lug/Junk sail installed
2021-05-21 splash today
Slip ready for splash
2021-05-14 topping lift installed, gas tank installed, ready for splash.
Sunday, April 4, 2021
April 2021
2021-04-04
Mast raised, registration numbers installed.
2021-04-24
Outboard DC starter cable connected. I may relocate and use a boot.
Anchor and rode installed.
More trash cleaned out.
2021-04-30 Mast base sheet cleats installed. Travel lift hydraulic repair work and high winds may create schedule backup and delay splash.
I may remove stanchions (except for bow and stern) and life lines, but add a tether or tether rings, this would be after splash or at next haul-out. I removed the tether rings in the cockpit when I did the bridge deck, but they will be reinstalled next week.
Saturday, March 13, 2021
March 2021
March 21, 2021
March 13, 2021
March 13, 2021. Tarp removed, two bags of trash removed.
Rustoleum Topside 2021-03-21
Total Boat Underdog bottom paint 2021-03-30 |