PAGES

Thursday, December 30, 2021

Tuesday, November 23, 2021

Tuesday, September 7, 2021

September 2021

 

Several days after Ida we still have debris in the river. Tree and root ball returning up river with the tide.

Sunday, May 2, 2021

May 2021

2021-05-24 Bimini installed


2021-05-23 Lug/Junk sail installed


2021-05-21 splash today


Slip ready for splash
 


2021-05-14 topping lift installed, gas tank installed, ready for splash.

Sunday, April 4, 2021

April 2021

2021-04-04 
Mast raised, registration numbers installed. 

2021-04-24 
Outboard DC starter cable connected. I may relocate and use a boot.
Anchor and rode installed. More trash cleaned out. 

2021-04-30 Mast base sheet cleats installed. Travel lift hydraulic repair work and high winds may create schedule backup and delay splash.

I may remove stanchions  (except for bow and stern) and life lines, but add a tether or tether rings, this would be after splash or at next haul-out. I removed the tether rings in the cockpit when I did the bridge deck, but they will be reinstalled next week.
With delayed splash there are so many items I would like to do but will wait. A redesigned mast dutch tabernacle is on the list for this winter and a fore peak hatch for light and ventilation.

Saturday, March 13, 2021

March 2021

March 21, 2021
 

March 13, 2021

March 13, 2021. Tarp removed, two bags of trash removed.





Rustoleum Topside 2021-03-21

Total Boat Underdog bottom paint 2021-03-30


Saturday, February 6, 2021

February 2021




 

2021-02-06 most of this weeks snow has melted, more coming tomorrow.

Saturday, January 2, 2021