PAGES

Fisher 25 fore peak and anchor chain locker renovation June 2025

 





Dryfit sole of fore peak


Anchor winch had previously been replaced with winch that had hawse pipe located to drop chain in fore peak cushion area.
2" galv pipe fitting used to turn chain into original cain locker.
100ft chain require the chain locker to be slightly larger for fall.
Temporary plywood panel installed to accomodate chain, chain locker expansion to follow.


Fore peek cleaned out. 
Failed water bladder removed. 
Anchor chain relocated to original chain locker.
Ledger cut for new fore peak sole.
Existing 1/2" drain tube from original anchor chain locker to remain. 

No comments:

Post a Comment