Tuesday, June 9, 2020

June 2020

2020-6-19 Sanding and penetrating epoxy to kort inspired nozzle early in the morning. I left the sander on a picnic table at the yard but it was still where I left when I returned that evening. Yard was full of cars and weekend boating activity had commenced. So no work on the boat until Monday morning early.


2020-6-17 bow ring replaced, previously damaged during haulout




I am only doing minor work on the boat during Covid-19 and only on mornings that will have few people at the boat yard. I will not splash in June but will wait and see how July and August go.

Working on the outboard well motor mount and cockpit drain. Added more PineSol to bilge. I will work on the cockpit and bridge deck after the motor is reinstalled in the outboard well, then deck paint.

If I don't splash in July, this will be time for working on electrics.

If I don't splash in August the boat will not splash this year, so perfect time to repaint the interior.

September will be topside paint.

October will be bottom prep ready for spring bottom paint.

2020-6-12 Worked on the boat at 6:30 AM for two hours, no one around and light traffic. This is probably the time I will work on the boat to limit exposure during the second Covid-19 wave, but I anticipate a return to the "stay at home" order in a few weeks. I will try 5:30 AM for projects that take more time, to be out of the boat yard by 9:00 AM