Headsail installed
Underdog bottom paint
Alado head sail roller furler installed
Back stay and Alado stay installed. Topping lift on, mainsheet installed
One lower stay to be shortened.
Gin Pole installedA mess of stays and shrouds at the mast head.
No comments:
Post a Comment