Mast raised, registration numbers installed.
2021-04-24
Outboard DC starter cable connected. I may relocate and use a boot.
Anchor and rode installed.
More trash cleaned out.
2021-04-30 Mast base sheet cleats installed. Travel lift hydraulic repair work and high winds may create schedule backup and delay splash.
I may remove stanchions (except for bow and stern) and life lines, but add a tether or tether rings, this would be after splash or at next haul-out. I removed the tether rings in the cockpit when I did the bridge deck, but they will be reinstalled next week.
No comments:
Post a Comment