Clean deck and cockpit, light sand and fresh coat of paint
Outboard; serviced; engine oil change, transfer case oil change, new spark plug.
Shore power and battery charger completed May 2014
Install air conditioning (from shore power) in progress May 2014
Install small refrigerator, shore power and 12 volt, unit ordered.
Replace interior cushions
Retractable cabin table, in progress
Add second battery
Lug sail conversion
http://sv-ulladh-log.blogspot.com/p/ul-la-junk-rig-conversion.html
Below water line clean, light sand and fresh coat of coal tar epoxy with copper flour.
March 11 65 deg F coal tar epoxy with copper flour below water line. |
Good luck with the winter projects, I am pulling my boat at the end of the year. I plan on giving her a thorough refit...maybe a year or 2 even. Lots to do and little money to do it with so it make take longer but when she goes back in our Alberg 30 will be our home as we plan to become liveaboards.
ReplyDelete