Boat hauled
Sail removed
November 2015:
Bottom cleaned and acid washed
Mast lowered on crutch, stays and lines removed
Outboard removed to storage
Mast and bowsprit painted with penetrating stain.
December 2015
Bottom sanded
Bottom painted with coal tar epoxy
February 2016
Bottom painted with coal tar epoxy and copper flour. 60 deg F, 45 deg F overnight, 60 deg F following day. |
Registration numbers removed, topside sanded ready for paint as over night temperatures increase.
Topside painted Rustoleum Topside paint.
Mast and sprit sanded and coated with spar varnish
Deck and cockpit cleaned with deck brush and hot water with dish detergent.
Front hatch cover reinstalled
Deck painted with Rustoleum Topside paint
Outboard engine oil change and service, new power cord from alternator.
Outboard installed |
Mast erected, temporary stays while recycled shrouds cut to length. |
April 2016
Wire rope shrouds installed.
Yard halyard installed.
Alado headsail furler installed.
No comments:
Post a Comment